WordPress.com bobmakin posted: " The broken cable which caused "technical difficulties" with the Twin Otter plane at Walaha just over a week ago is being investigated. Air Vanuatu, Vanuatu Civil Aviation and Civil Aviation NZ are conducting the inquiry. The cable was manufactured in " Respond to this post by replying above this line New post on Vanuatu Daily Digest Air Vanuatu Twin Otter cable snap incident under investigation by bobmakin File photo of an Air Vanuatu Twin Otter at Gaua Airport. Photo: Olivier Morice/Wikimedia Commons The broken cable which caused "technical difficulties" with the Twin Otter plane at Walaha just over a week ago is being investigated. Air Vanuatu, Vanuatu Civil Aviation and Civil Aviation NZ are conducting the inquiry. The cable was manufactured in New Zealand. The break was potentially very serious, but occurred just as the plane was landing and the pilot handled the matter majestically, Air Vanuatu advises. Good news for Air Vanuatu safety at the same time is the airline's passing of its IATA Operational Safety Audit (IOSA). CEO Joseph Laloyer said the results of the 2016 audit were the best ever achieved by the company. (Daily Post) Read more of this post bobmakin | October 11, 2016 at 5:46 pm | Tags: art, aviation, law, MSG, PACER Plus, PacLII, Solomon Islands, trade, Vanuatu, West Papua | Categories: The Daily Digest | URL: http://wp.me/p2A4RK-1lk Comment See all comments Unsubscribe to no longer receive posts from Vanuatu Daily Digest. Change your email settings at Manage Subscriptions. Trouble clicking? Copy and paste this URL into your browser: http://ift.tt/2eazeFs Thanks for flying with WordPress.com
from Gmail
via IFTTT
Navigation
No comments:
Post a Comment